国产一区二三区好的_国产日韩综合不卡免费观看ä_日韩国产欧美在线观看视频_日本在线观看中文字二区_女性向羞羞片silk在线观看_久久er99国产精品_18禁无码av免费不卡_免费a级毛片无码韩国_中文字幕乱在线伦视频日韩_91国自产精品中文字幕

Welcome to Ningbo Tianxiang Precision Casting Co., Ltd!

Silica sol casting manufacturer
Your current location : home >> Products >> Cylinder accessories
Cylinder accessories

Cylinder accessories

  • Classification:Cylinder accessories
  • Release date:2020-06-08 14:32:02
24-hour free consultation hotline:13567493235
  • Product overview

Material is QT450

The zinc alloy die casting factory will hang the mold group after sanding in the mold base car, push the message to the whole surface dry room for dry manic after the whole car is full.

In the processing of zinc alloy die casting, when the first layer is dry hot for 6 hours, check the dry hot level; if the dry hot level is up to the standard, just start the second layer of work.

Blow away the unnecessary floating sand, soak in the pre wetting agent produce after infiltration; remove it immediately carry out the second coating as soon as possible.

Apply the second layer (joint layer) slurry, the actual operation is the same as above.

Sand spreading in the second layer:

When the second layer of mixed quartz sand is specified for the casting

When the casting requirements are high, the second layer is too much sand. Put the soaked shell mold into the floating sand bucket to apply sand, check the all-round cover; shake off the unnecessary floating sand.

Hang the shell mold after the excellent sand in the mold carrier car, push the information to the second layer drying room to carry out drying.

When the second layer is dry for 8 hours, check its dry humidity. If it reaches the standard, carry out the construction coating of structural reinforcement layer.

Blow away the unnecessary floating sand, infiltrate the third layer of pre wetting agent (the same as before), then apply the third layer of slurry sand again in the same way.

After the third layer is applied with sand, the shell mould after the excellent sand is hung in the mould carrier car sent to the drying room of the structural reinforcement layer for drying.

The fourth fifth holes of the structural reinforcement layer are N1, which is called NR, soaked with pre wetting agent, stained with the slurry of the structural reinforcement layer, then sand size as required


氣缸附件

Label

Last article:Cylinder accessories2020-06-08
Next article:Cylinder accessories2020-06-08

Recently:

Related products

Related news

  • 13567493235

    13567493235

  • 0574-88787776

    0574-88787776

  • Beside Matou station, Qiucun Town Fenghua, Ningbo City, Zhejiang Province

    Beside Matou station, Qiucun Town Fenghua
    Ningbo City, Zhejiang Province

  • Beside Matou station, Qiucun Town, Fenghua, Ningbo

    Beside Matou station, Qiucun Town
    Fenghua, Ningbo